33rd Street Bridge
Chicago, IL United States | 2007
Menu • Quick Links • Search
The design, approval, fabrication, and erection of the fabulous Fore River Bridge was an arduous five-year process. Designed uniquely for this site, the Acrow Corporation is one of the few companies that have lift-bridge design experience, making the Fore River Bridge an awesome reality.
This truly majestic structure is a key element of the 3H highway connecting Boston and Cape Cod, Massachusetts, and will proudly serve for generations.
Acrow chose hot-dip galvanizing to protect the 8,000 tons of structural steel components and fasteners because of its longevity, consistent appearance over many decades, and virtually maintenance-free lifetime. The schedule required three galvanizing companies to supply the durable zinc coating to the structural steel. Working as a team, the three even hand-dipped custom-made components that required special care. Integrated into the design are marvels of electrical and mechanical engineering, working in harmony with the moving steel pieces protected by hot-dip galvanizing. This truly majestic structure is a key element of the 3H highway connecting Boston and Cape Cod, Massachusetts, and will proudly serve for generations.
Newly Complete
Bridge & Highway
Industrial/Urban
Quincy, MA United States
Quality of HDG
Bolts, fasteners, and all structural components.
HDG: 8000
Mark Joosten
Milton Steel
The Middlesex Co.
Duncan Galvanizing Corp.
V&S Taunton Galvanizing LLC
Valmont Coatings - American Galvanizing
Young Galvanizing, Inc.
Thank you! Your vote has been accepted.