Akzo Nobel Paint Facility
Pontiac, MI United States | 2004
Menu • Quick Links • Search
Limiting worker exposure to the chemical storage area was the objective in designing the chemical platform with galvanized steel. The platforms required progressive dipping because of their size (22' x 13' x 2' 3'') and a mid-winter installation in this harsh chemical atmosphere.
Newly Complete
Industrial
Industrial/Urban
Walton, KY United States
Turnaround Time
Columns, beams, angles, flat bar, square tube bracing, and platforms.
Steel: 17
HDG: 17
Stokes Steel and Construction Inc
AZZ Metal Coatings
Thank you! Your vote has been accepted.