Lincoln Financial Football Field
Philadelphia, PA United States | 2003
Menu • Quick Links • Search
Since the public will be in direct contact with most of the exposed steel, a smooth finish was critical. All of the exposed steel, railings, support frames and stairways are hot-dip galvanized. All of this steel not only catches the public's attention, it is a positive representation of hot-dip galvanizing. Paul Brown Stadium is one of the most expensive professional football stadiums ever built.
With the intense weather changes in Cincinnati and physical abuse that the stadium endures, the protection of the steel is imperative.
In addition to being one of the most expensive, it is also one of Cincinnati's most eye-catching structures. The aesthetically pleasing exterior consists primarily of exposed steel. Quick turnaround time for galvanizing was critical because the entire stadium construction schedule was 24 months. With the intense weather changes in Cincinnati and physical abuse that the stadium endures, the protection of the steel is imperative.
Newly Complete
Recreation & Entertainment
Industrial/Urban
Cincinnati, OH United States
Prior HDG Experience
Handrails, concrete embedments, structural frames for façade support, and concrete column kickplates.
Steel: 9100
HDG: 800
Complete Metalworks Technology
NBBJ Architecture
AZZ Metal Coatings
Thank you! Your vote has been accepted.