Hambro Portable Parking Structure
St. Lambert, QC United States | 2010
2010
Menu • Quick Links • Search
The Dallas Fort Worth Airport is the 3rd largest airport in the United States. This park and ride structure is conveniently located near the airport and has been at capacity since its opening. When construction of the facility was underway, the owner desired an aesthetically appealing facility that required little or no maintenance.
The galvanized coating provides the owner with the aesthetically appealing facility he desired...
Because the facility is in use 24 hours a day 7 days a week, closure for maintenance results in a financial loss for the owner. The owner requested hot-dip galvanizing for corrosion protection to avoid the timely and costly maintenance a paint system requires. Forty-three tons of steel, including radius beam sections, wide flange beams, angles, and plates were hot-dip galvanized. The galvanized coating provides the owner with the aesthetically appealing facility he desired, while eliminating costly maintenance, ensuring the park and ride customers will enjoy the convenience of the facility for many years to come.
Newly Complete
Building & Architecture
Transportation
Industrial/Urban
Irving, CA United States
Corrosion Performance
Wide flange beams, angles and plates.
Steel: 43
HDG: 43
John O'Brien
Keith Leslie Techni Structures Inc
W&W Steel, Conam Construction, Newport Beach Boswell Steel Erectors
AZZ Metal Coatings
Thank you! Your vote has been accepted.