City of Utuado Bridges (After Hurricane Maria)
Utuado, Puerto Rico | 2018
2019
Menu • Quick Links • Search
The crossings between St. Jean and Iberville is steeped in history, dating back to 1775 when the Revolutionary American Army crossed the site in a ferry. Since 1915, a concrete structure was in place, after the initial wooden structure was destroyed in a flood. Although the concrete bridge lasted a century, it underwent decades of perpetual renovation. Harsh climate and liberal use of deicing chemicals on roadways make life quite difficult for bridges in this part of Canada. So, a new bridge was approved with the goal of limiting the expensive and traffic disrupting maintenance the current bridge was too well known for.
Thanks to its proven track record, hot-dip galvanizing was chosen for all structural steel and rebar on this new bridge.
Pre-stressed concrete bridges are proving to be colossal failures in Quebec with hard to detect and impossible to repair corrosion of the tensioners. Older painted steel bridges provided longer life-spans, but not without the traffic snarls and serious economic and environmental costs of repeated repainting programs. The first fully hot-dip galvanized bridge in North America is located less than 100 miles away, and after 56 years as yet to require any maintenance of its galvanized components. In fact, recent testing has shown the zinc thicknesses still met minimum requirements for brand new product!
With this proven track record hot-dip galvanizing was chosen for all structural steel on this new bridge. The large modern galvanizing plants nearby made short work of the tonnage and their large kettles allowed even the largest beams to be galvanized in a single dip. The rugged, pure zinc coating and careful finishing by the galvanizer around all mounting areas insured rapid on-site assembly and erection.
This new and on time, $126 million bridge, now fully protected with the durable strength of galvanized steel will surely span this storied crossing long enough to see much history made during its watch.
Newly Complete
Bridge & Highway
Temperate Marine
Saint-Jean-sur-Richelieu, QC Canada
Coating Durability, Corrosion Performance, Life-Cycle Cost, Prior HDG Experience, Quality of HDG, Sustainability
The entire bridge structure and 800 tons of galvanized rebar
Steel: 3250
HDG: 1150
Genivar
Guillaume Boucher-Proulx
Cima
Dessau
Construction Proco Inc
Claude Croisetière
Les Aciers Orford
Ministère des Transport du Québec
Pomerleau
Corbec - Quebec