South Campus Central Chiller Plant at The Ohio State University
Columbus, OH United States | 2012
2013
Menu • Quick Links • Search
Prior to the construction of the Armand Hammer Student-Alumni Center, Oral Roberts University did not have a building where students were able to gather to socialize, relax, and connect, seven days a week, without leaving campus. The new center is a centrally located structure with recreation facilities and lounging accommodations that can easily provide for hundreds of students without feeling crowded. The new facility is used to support the retention of current students and to significantly enhance the Oral Roberts University experience.
Paint over hot-dip galvanizing provides a perfect combination of aesthetic appeal and superior corrosion protection.
Oral Roberts University acknowledged that many universities are building new student centers or remodeling older structures. To attract students, the university needed to offer facilities that addressed student needs.
Hot-dip galvanizing was specified for the Armand Hammer Student-Alumni Center to protect the structural steel surrounding the center and to plan for the future as well. Paint over hot-dip galvanizing provides a perfect combination of aesthetic appeal and superior corrosion protection. The investment by donors and alumni will be safeguarded for generations as a result of hot-dip galvanizing the structural steel used in this project.
2013
Newly Complete
Artistic
Building & Architecture
Duplex Systems
Industrial/Urban
Tulsa, OK United States
Corrosion Performance, Life-Cycle Cost, Prior HDG Experience, Quality of HDG, Sustainability
The structural tube, channel, brackets, and angle assemblies of the perimeter structure were hot-dip galvanized and then painted.
Steel: 105
HDG: 70
James Kukodich
Unique Metal Fabrications
Valmont Coatings - Oklahoma Galvanizing
Thank you! Your vote has been accepted.