Wellington Bridge Refurbishment
Wellington, Australia | 2014
Menu • Quick Links • Search
The West Virginia Division of Highways announced that it is using a new type of technology to replace a bridge in Lincoln County. The Fourteen Mile Bridge, along County Route 37 near Ranger, is the first bridge in West Virginia to utilize an innovative technology called a press-brake-formed steel tub girder bridge.
Dr. Greg Michaelson, an assistant professor of engineering at Marshall University, has assisted the Short Span Steel Bridge Alliance (SSSBA) and the West Virginia Department of Highways (WVDOH) in developing West Virginia’s first press-brake-formed steel tub girder bridge. The new bridge consists of five press-brake-formed steel tub girders that span 58 feet from abutment to abutment.
We believe more press-brake-formed steel tub girder bridges will be built in West Virginia based on their modular design and efficient construction, which can result in less disruption to traffic. ~Tracy Brown, WV State Bridge Engineer
The press-brake-formed tub girder system consists of galvanized shallow trapezoidal boxes fabricated from cold-bent structural steel plate. A concrete deck is precast on the girder, making it a modular unit that can be transported by truck to the project site. The system is ideal for spans up to 60 feet. It saves time and costs for bridge owners since it can be installed as a single modular unit usually in one or two days by local crews, will last for an estimated 100 years, and requires minimal maintenance during its lifetime.
The expedited installation process also helps to minimize disruption to traffic. The 100 year lifespan and minimal maintenance is due in part to the hot-dip galvanized coating used to protect the inside and outside of each structural tub girder. The durability of the galvanized coating allows for the quick installation of each modular piece without concern of touch up, repair or future corrosion.
Newly Complete
Bridge & Highway
Rural
East Lynn, WV United States
Coating Durability, Corrosion Performance, Ease of Specifying, Life-Cycle Cost
Five press-brake-formed tub girder system consisting of galvanized shallow trapezoidal boxes fabricated from cold-bent structural steel plate. Each piece was 58' long.
Steel: 19
HDG: 19
Infra-Metals
Dr. Gregory Michaelson
Marshall University
Dr. Karl Barth
West Virginia University
West Virginia Department of Highways
ORDERS Construction Company
V&S Columbus Galvanizing