Beaver Stadium, nestled in the rolling landscape of Happy Valley, Pennsylvania, is the beating heart of Penn State athletics and one of the largest stadiums in the world, accommodating more than 106,000 fans. This iconic venue is undergoing a multi-phase renovation through 2027 to elevate the spectator experience and modernize its infrastructure. The current phase, completed in 2025, introduces enhanced circulation at entrances and exits, upgraded interior spaces and fan amenities, improved accessibility throughout the facility, and the integration of more sustainable technologies and design strategies to support the stadium’s long-term performance.
Caleb Rockey, Project Manager, “This project consisted of 18 separate shipments, over a 12 week-period, with each load requiring a 1-week or less lead time. Not only did the galvanizer deliver on-time but managed to keep a consistent high-quality finished product paired with professional communication throughout the duration of this project.”
The fast-tracked construction schedule began in June and concluded in mid-August 2025—just in time for kickoff of the 2025 football season. Over 3,000 linear feet of stair, hand, and barrier railing were fabricated, galvanized, and installed within a 12-week window. To meet the accelerated timeline, the galvanizer leveraged the coordinated capabilities of multiple facilities, ensuring continuous throughput, consistent quality, and seamless logistics.
Hot-dip galvanizing was selected as the protective coating due to its unmatched ability to perform under the demanding conditions of a major collegiate stadium. The coating offered the essential combination of rapid turnaround, ease of installation, long-term corrosion protection, and a clean, uniform aesthetic suitable for high-visibility public environments. In a setting where performance, reliability, and longevity are non-negotiable, galvanized steel provided the durable, cost-effective solution needed to support Beaver Stadium’s next era.
Newly Complete
Recreation & Entertainment
Suburban
State College, PA United States
Aesthetics, Coating Durability, Ease of Specifying, Turnaround Time
3000 linear feet of railing.
Steel: 45
HDG: 45
Spicer Welding & Fabrication Inc.
Sipple Steel
Barton Malow