The renewal of Hurva-Sege transmission line has included erection of 136 newly galvanized steel lattice towers in heights between 24 and 37 meters constructed with concrete foundations.
Renewal of 42km 400KV power transmission line between substation Hurva and substation Sege. The project has executed both dismantling of 400KV transmission line, including excavation of old foundations, erection of new 400KV transmission line. New transmission line is partially built in new established line corridor, but mostly in existing line corridor.
Newly Complete
International
Rural
Malmo, Sweden
Aesthetics, Coating Durability, Corrosion Performance, Life-Cycle Cost, Prior HDG Experience, Quality of HDG, Sustainability
Angles
Channels
Beams
Pipes
Rectangular Hollow Sections
Fasteners
Steel: 2329
HDG: 2329
Linjemontage
Simplex Engineering Co.
Kalpataru Projects International Ltd.